Loading...

Hae Kwang Co., Ltd.

A-2F, Yongma Life Bldg.
5, Dwitgol 1-ro
Gwacheon-si, Gyeonggi-do,  Gyeonggi-do  13814

Korea (South)
http://www.haekwang.com
  • Booth: 1269


Welcome to Haekwang–Leading Aluminum Raised Floor Solutions

Since its founding in 1987, Haekwang Co., Ltd. has built deep expertise in the design, manufacturing, and installation of all‑aluminum raised access floor systems. Our innovative solutions are trusted globally in high-tech environments, including semiconductor fabs and LCD cleanrooms, thanks to our commitment to strength, precision, and quality control.

We offer a comprehensive product range including aluminum panels, pedestals, stringers, and understructure systems, all engineered to support demanding loads, ensure stability, and accommodate varied floor heights (from 250 mm to 3,000 mm) and grid spacing. Optional reinforcement modules are available to enhance load capacity for heavy equipment areas.

Committed to continuous innovation, we support the ongoing progress of high‑technology industries worldwide with durable, high‑performance flooring systems that exceed expectations.


 Press Releases

  • Since 1987, Haekwang Co., Ltd. has been a trusted leader in aluminum raised floor systems, delivering innovative solutions for semiconductor fabs, LCD cleanrooms, and other high-tech facilities worldwide. With decades of expertise in design, manufacturing, and installation, Haekwang provides durable and precise products—including panels, pedestals, and airflow solutions—engineered to meet the most demanding standards. Committed to continuous innovation and customer-focused service, Haekwang supports the global advancement of high-technology industries.

 Products

  • Blind Panel
    Ideal for areas with the heaviest loading requirements, Hae Kwang’s solid panels have unique lattice structures that allow for optimum weight dispersion and secure the installation of heavy tools inside clean rooms....

  • Ideal for areas of the heaviest loading requirement

    Ideal for areas of the heaviest loading requirement Hae Kwang’s Solid panel shave unique lattice structures that allow for optimum weightstructures that allow for optimum weight dispersion and secure the installation of heavy tools inside clean rooms.

    Advantages
    1. Excellent loading capacity: 500~3,000 kgf / 2 mm deflection
    (=1,100~6,600 lbf @ 0.08 inch deflection)
    2. Precisely manufactured to meet dimensional requirements with minimum tolerance
    3. Minimum emission of volatile organic compounds (VOC’s)
    4. Strict quality control to meet electrostatic conductivity requirements
    5. Extremely durable and recyclable

  • Perforated Panel
    Hae Kwang’s perforated panels with 1,296 or 1,024 chamfered holes provide all the features of solid panels and a nominal air open ratio that ranging from 14~26% to meet specific airflow requirements inside cleanrooms....

  • Perforated Panel

    Hae Kwang’s perforated panels with 1,296 or 1,024 chamfered holes provide all the features of solid panels and a nominal air open ratio that ranging from 14~26% to meet specific airflow requirements inside cleanrooms. Each perforated panel is carefully checked to eliminate any potential contaminants including adhesive residues.

    Advantages
    1. Air open ratio ranging from Range (14~26%)
    2. Excellent loading capacity:(500~3,000 kgf / 2 mm defection point)
    3. Precisely manufactured to meet dimensional requirements with minimum tolerance
    4. Minimum emission of volatile organic compounds (VOC’s)
    5. Strict quality control to meet electrostatic or conductivity requirements
    6. Extremely durable and recyclable

  • Grating Panel
    Hae Kwang’s non-directional grating patterns with nominal airopen ratios ranging from 51~54% facilitate unrestricted smoothairflow and minimize vibration from rolling loads...

  • Grating Panel

    Hae Kwang’s non-directional grating patterns with nominal airopen ratios ranging from 51~54%
    facilitate unrestricted smoothairflow and minimize vibration from rolling loads.
    Hae Kwang’sgrating panels are ideal for use in air-return chase and ballroom areas.

    Advantages
    1. Air open ratio ranging from 51% to 54%
    2.Excellent loading capacity: 500~1,000 kgf / 2 mm deflection
    3. Available with electrically conductive or nonconductive coating
    4. Strict quality control to meet electrostatic or conductivity requirements
    5. Extremely durable and recyclable

  • View Panel
    Manufactured as per dimensional specifications from customers, view panels allow visibility and easy access to gauges, piping, and electrical wiring that run under cleanroom floors....

  • View Panel

    Manufactured as per dimensional specifications from customers, view panels allow visibility and easy access to gauges, piping, and electrical wiring that run under cleanroom floors.

    1. Customized acrylic or polycarbonate inserts allow visibility and easy access to under cleanroom floors
    2. Can be customized to meet specific loading requirements.
  • Pedestal
    Available in aluminum, steel, combination thereof, Hae Kwnag’s custom-designed pedestals have been proven to meet any axial loading requirements. Moreover, Hae Kwang’s pedestals provide flexibility in height adjustment (typically ±25 mm)....

  • Pedestals

    Available in aluminum, steel, combination, thereof,Hae Kwnag’s custom-designed pedestals have
    been proven tomeet any axial loading requirements. Moreover, Hae Kwang’s pedestalsprovide
    flexibility in height adjustment (typically ±25 mm).

    Advantages
    1. Finished Floor Height (FFH): 160~1,500 mm (6.30~59.06 inch)
    2. Axial Loading Capacity: 4,000~15,000 kgf (8,800~33,000 lbf )
    3. Available in bare aluminum, electrocoating, or epoxy powder coating finishes


Send Email

Type your information and click "Send Email" to send an email to this exhibitor. To return to the previous screen without saving, click "Reset".