Trust Teck

Hsinchu City, 
Taiwan
http://www.trustvak.com
  • 小間番号4003


 出展製品

  • Pump repair
    Turbo pump, Rotary pump repair...

  • Maintenance process

    1. Pre-maintenance function test

    2. Detailed disassembly and photo archive

    3. Parts cleaning and drying

    4. Parts Inspection (Rotor, Stators, Shaft, Motor, Base flange)

    5. Consumable replacement (Ball bearing set, Sealing kit)

    6. Assembly

    7. Dynamic balance correction

    8. Final functional test

    ● Run up time and current condition

    ● Leak rate test

    ● Motor ELSI test

    ● Motor & Bearing temperature check

    ● Over night test

    9. Maintenance report production